Expert BIM Consulting Services for Global AEC Professionals
Why Choose Cresire for BIM Consulting Services?
Cresire is a specialized Building Information Modeling consulting firm dedicated to solving complex design, coordination, and construction management challenges for global AEC professionals. Our BIM consulting services go beyond basic modeling; we provide strategic advisory, BIM implementation support, advanced collaboration, and technical expertise that transform how your team approaches design development and construction management.
Serving clients across the USA, UK, UAE, Greece, Italy, France, and Australia, our team of certified BIM Technicians, Architects, and Engineers trained at world-class institutions brings deep technical knowledge and real-world construction experience to every project. Our BIM consulting services leverage industry-leading platforms, including Autodesk Revit, Navisworks, Recap Pro, and 3ds Max, to deliver models that not only look good but also work flawlessly through every project phase.
Using diverse BIM software such as Autodesk Revit, AutoCAD, Navisworks, 3ds Max, and ReCap Pro, we strategise BIM implementation based on the required level of detail (LOD), dimensions (3D–6D), and the coordination requirements of a project. We assist first-time BIM users and clients in choosing the appropriate LOD, dimensions, and software.
Our BIM Capabilities At a glance

BIM 4D Scheduling and Simulation
Plan Smarter with BIM 4D—Visual Schedules for Confident, On-Time Project Delivery

Point Cloud to BIM Services
Creating 3D BIM models from RCP, E57, LAS scans for renovations and historic preservation.

3D BIM Modeling
Creating 3D Architectural, Structural, and MEP models from 2D Design Drawings or Laser scans

Point Cloud to CAD
Creating 2D CAD Drawings from laser scans for renovations and planning projects

3D Visualisation Services
Producing photorealistic 3D renders of building exteriors and interiors in HD or 4K

AutoCAD Drafting Services
Providing CAD drafting services including PDF to CAD, detailed construction and shop drawings for all disciplines
Client's Feedbacks for our Top-notch BIM Services
Why Partner with us for BIM Consulting and Project Management Services?
Intelligent BIM Models
Developing coordinated 3D information models (LOD 300 – As-Built) across Architectural, Structural, and MEP disciplines, tailored to each stage of design development.
Accurate BOQ Generation
Extracting precise quantities of design elements of a building and preparing comprehensive BOQ for cost planning
Clash Coordination
Interdisciplinary clash detection between architectural, structural, and MEP disciplines helps eliminate design risks that can lead to rework and additional costs
Lifecycle Management
Integrating asset information into design elements within BIM models provides access to lifecycle details that are critical for future renovations and effective building management.
Specialized BIM Consulting Services Across Multiple Sectors
Commercial & Office Buildings
Efficient BIM solutions that enhance design clarity, reduce clashes, and support faster project delivery.
Healthcare & Hospitals
Precise BIM modeling that supports complex layouts, compliance needs, and seamless MEP coordination for healthcare facilities.
Industrial & Manufacturing
High-accuracy BIM workflows tailored for heavy equipment layouts, safety planning, and optimized production environments.
Infrastructure & Transportation
Reliable BIM services that improve planning, clash detection, and coordination for roads, bridges, and transit projects.
Educational Institutions
Our Smart BIM support for schools and campuses focused on safety, flexibility, and long-term facility management.
Residential & Mixed-Use
Detail-rich BIM models that streamline design, improve visualization, and enhance constructability for modern living spaces.
Our Success Stories from the Field - Case Studies
CRESIRE is proud to be a part of BIM construction management, Scan to BIM, 3D rendering, and CAD drafting projects across 8+ countries, including the USA, UK, Australia, Germany and Italy. As one of the top BIM consulting and solutions providers, our skilled BIM architects and engineers have supported AEC professionals from diverse sectors and industries. Below are some of the notable projects we have contributed to:
CRESIRE undertook the BIM Industrial Mixed development, delivering outstanding results within the stipulated timeframe. The mixed development included 3D BIM, and 5D BIM Quantity Takeoffs in Architectural, Structural, and MEP disciplines, covering 15,000 sqm, comprised various components:
- Factory: Mixed RCC and steel structure development
- Staff Accommodation: A well-designed living space accommodation for staff.
- Commercial Building: A well-planned office spaces and commercial units.
- Parking Area & Water Tank: A strategically designed parking facility and Water Tank.
Point Cloud to BIM Modeling of 25+ Floors Skyscraper building in Dubai, UAE.
The project used Laser scans of the existing Multi-story building for developing 3D Revit Models in Architectural, Structural, and MEP disciplines.
Read the Full Case Study to learn how CRESIRE’s point cloud to BIM Management services allowed the client to make critical design decisions for the main consultant.
To improve project outcomes and speed up the client’s workflow, CRESIRE was hired to provide structural BIM modeling and structural framing plan drafting services for a church project.
The main goals were to improve stakeholder communication, reduce errors in construction documentation, and expedite project deadlines.
Our Software Expertise
Our BIM Trending Blogs
CRESIRE posts weekly blogs on BIM Construction Management trends, BIM outsourcing services, and CRESIRE’s latest BIM and Construction management contribution to the AEC industry at a Global Level. The blogs contain information about the latest practices & standards and services essential for Construction Management with BIM. Read our blogs if you are new to BIM construction management services or wish to expand your knowledge about BIM.

How AEC Firms Can Reduce Construction Rework with BIM
Learn how AEC firms can reduce construction rework, delays, and cost overruns using BIM. Expert insights from Cresire, trusted BIM consultants.

Top 10 Most Inspiring Mega-Structures Built Using BIM Globally (Updated 2026)
Discover the top 10 BIM projects worldwide. Learn key lessons AEC firms can apply to reduce risk, cost, and delays. Know more!

BIM for Construction Management: Reduce Delay, Risk & Cost Overruns with Cresire
Use BIM for construction management to reduce delays, risks, and cost overruns. Cresire delivers 4D, 5D BIM, coordination, and construction planning services.

Point Cloud Noise, Distortions & Errors
Understand point cloud noise, distortions, and errors in laser scanning. Learn causes, impacts on BIM accuracy, and how to correct them effectively.
FAQs ( Frequently Asked Questions )
Q1: What exactly are BIM consulting services?
BIM consulting services provide strategic advisory and technical implementation support for Building Information Modeling across all project phases. At Cresire, our BIM consulting services combine strategic guidance with hands-on technical expertise to ensure your models drive real project value.
Q2: How do BIM consulting services reduce project costs?
Our BIM consulting services identify design conflicts during the digital phase when changes cost significantly less than on-site modifications. Through accurate clash detection, precise quantity takeoffs, and coordinated 4D scheduling, clients typically save 10-20% on overall project costs while accelerating delivery timelines by eliminating rework.
Q3: What LOD (Level of Development) services Cresire support?
Cresire’s BIM services deliver models from LOD 200 through LOD 500, depending on your project phase. We create LOD 300 coordinated models for design development, LOD 400 fabrication-ready models for construction, and LOD 500 as-built models for facility management.
Q4: Can your BIM consulting services integrate with our existing team?
Absolutely. Our BIM consulting services are designed to complement your in-house capabilities. We work collaboratively with your architects, engineers, and contractors, adapting to your workflows, communication protocols, and software standards.
Q5: How quickly can you start providing BIM solutions or services?
We typically initiate within 3-5 business days of project kickoff. Our onboarding process includes a discovery call, workflow assessment, and resource allocation. For urgent projects, we offer expedited consulting setup with dedicated team members available within 24-48 hours.
Q6: What’s the difference between BIM outsourcing and BIM consulting services?
BIM outsourcing focuses primarily on model production, converting drawings into 3D models. BIM consulting services encompass strategic guidance, process optimization, and quality oversight in addition to technical execution.
Q7: Do your BIM consulting include training?
Yes. Knowledge transfer is integral to our BIM consulting and solutions. We provide documentation, create project-specific templates, and offer training sessions to build your team’s internal BIM capabilities.
Q8: Which countries do you provide BIM services in?
Cresire delivers BIM services globally, with active projects across the USA, UK, Australia, Germany, Italy, Greece, France, and beyond.