MEP BIM Services on a Skyscraper Project

Case Study

Project Description

Client: Leading BIM Company in the Middle East

Project: Construction of a high-rise tower

Scope: Comprehensive 3D MEP BIM modeling, 

Inclusions: Mechanical systems (HVAC, Plumbing, etc.), Electrical systems (power distribution, lighting, etc.), Fire protection systems, Facility management integration

Deliverables: Revit models, clash detection reports, coordination drawings

United States

(+1) 757 656 3274

United Kingdom

(+44) 7360 267087

Challenges

  • Low-quality Point Cloud Data, Tight Deadlines, Integration with Architectural and Structural Models
revit-mep-modeling-building-cresire

Services offered by CRESIRE

  • MEP Revit Modeling: CRESIRE’s skilled BIM modelers created detailed and accurate 3D models of all MEP systems, ensuring consistency and compliance with international standards.
  • Clash Detection: Utilizing Navisworks, CRESIRE identified and resolved potential clashes between MEP systems and other building elements before construction began, saving time and cost during on-site execution.
  • Coordination with Stakeholders: CRESIRE facilitated efficient communication and collaboration between the project stakeholders, ensuring seamless integration of all disciplines

Action Plan for Successful MEP BIM Modeling Implementation

  • Pre-construction Planning: Cresire established data exchange protocols for seamless collaboration between software platforms. Our team created detailed BIM standards and guidelines for consistent modeling practices.
  • 3D Modeling and Clash Detection: Developed LOD 350 MEP models using Revit. Also, utilized Navisworks for clash detection to identify and resolve potential clashes within the MEP model.
  • Coordination and Communication: Cresire utilized BIM models for visual coordination and clash resolution meetings.

Let's Discuss Your Project Requirements

Values Added to the MEP BIM Modeling Project

  • Reduced construction errors and rework: Early clash detection and resolution through BIM minimized costly rework during construction, saving time and resources.
  • Improved coordination and collaboration: BIM facilitated seamless communication and collaboration between stakeholders, leading to a more efficient and streamlined project workflow.
  • Improved facility management and operations: The MEP BIM model was a valuable asset for facility management, enabling efficient operation and maintenance of the building systems.

Conclusion

CRESIRE’s MEP BIM modeling services played a significant role in making informed design decisions and facilities management. By implementing a comprehensive action plan and leveraging the power of BIM, CRESIRE helped their client achieve design precision, improved scheduling, and enhanced collaboration.

Let's Talk

USA - (+1) 757 656 3274
UK - (+44) 7360 267087
INDIA - (+91) 63502 02061

Scroll to Top